Wera Hobhouse MP urges government to incentivise solar power

29 Feb 2024
wera
Clive and Bus

New Buses To The Royal Berks Are A Success

Lib Dem PPC for Wokingham Clive Jones met today with the MD of Reading Buses to review the progress of the enhanced number 21 route and new number 19a,b&c which go from Earley to Reading via the Royal Berkshire hospital. It seems that passenger numbers are better than expected in the first month of the new timetable and new routes.

16 Aug 2014
View
No to Charlton Lane Incinerator (Eco Park)

Another betrayal of Incinerator campaigners

Spelthorne: following their spectacular U-turn, to suddenly oppose the Charlton Incinerator on the run up to the 2011 local elections have again shown that it was a totally hollow cosmetic gesture. Already they have broken their word to residents telling them they would oppose the divergence of a foot path needed to make the scheme happen, but writing to Surrey saying they had 'No Objection'

16 Aug 2014
View

BROADBAND MEETING WITH BT AND 'CONNECTING SHROPSHIRE'

This week I had an interesting if not very helpful meeting with BT and a Council officer from 'Connecting Shropshire' about Broadband in Snailbeach and Stiperstones. We were told that the 'Openreach Line Checker' (which indicating speeds people were receiving in our area) was faulty and would be overhauled to give the correct speeds. They thought it unlikely that any properties in Stiperstones were receiving superfast speeds, these being only guaranteed for 1.2 kilometres from the new cabinet in Snailbeach. The copper wire cables serving most properties in our area is not able to deliver high speeds over long distances. When asked if there were any plans to replace the old wire they said that it had not been built into the business plan. We asked what options were there for the future? BT said they were piloting fibre cables being carried on poles instead of underground. They are also experimenting with new technology which enhances the speed and range from boxes on the poles themselves. We asked if there wa

15 Aug 2014
View
Dave Hodgson with Town Bridge behind

Mayor's A Level Congratulations for Borough Students

Mayor Dave Hodgson has congratulated local students and school and college staff following the publication of A Level exam results. The results across Bedford Borough showed more local students achieving top grades, in the face of the widely-reported national decline in A* and A grades.

15 Aug 2014
View

Wera Hobhouse, Liberal Democrat MP for Bath and spokesperson for Energy Security and Net Zero, called on the government to provide incentives for energy providers to develop solar power in the UK.

 

Mrs Hobhouse slammed the government for falling behind on meeting the UK’s renewable targets for solar energy capacity. The government plans to deploy 70 GW of solar power across the country by 2035. However, as of 2022, the UK had only installed 14.3 GW of solar pv. 

 

Following a visit to a rooftop solar system installed by Bath & West Community Energy (BWCE) at Beechen Cliff School last year, Wera Hobhouse is keen to encourage the development of similar solar projects across Bath. The solar system is predicted to significantly cut the school’s fuel costs and reduce their carbon emissions by 52 tonnes a year.

 

In the House of Commons on the 27th February, the Bath MP noted that the UK is lagging behind the rest of the world in renewable energy investment, she urged the government to offer incentives to energy providers to improve solar capacity. 

 

However, Andrew Bowie, Parliamentary Under Secretary for Energy Security and Net Zero, ignored Hobhouse’s proposals, failing to describe the ways in which the government could incentivise solar energy. Instead, Bowie said that the government’s Solar Taskforce would publish recommendations for solar power and reiterated the government’s target to deploy 70 GW by 2035. 

 

Wera Hobhouse, Liberal Democrat MP for Bath and spokesperson for Energy Security and Net Zero, commented:

 

“The Conservatives are falling dangerously behind on meeting our targets for renewable energy production. It is no good the government setting an ambitious 70 GW solar target if they are nowhere near reaching it. 

 

“It is clear that they have no plan to get us back on track to reach Net Zero. Evidently, they are more than happy to dismiss perfectly good proposals like incentivising solar power. That is why I am so proud that Bath is home to many community energy projects like the solar system at Beechen Cliff School, so that we can lead the way in renewables.” 

 

“It is not just our climate targets harmed by the Conservatives’ delay. Families in Bath and across the country are struggling to pay soaring energy bills which investment in renewables could curb. That is why we Liberal Democrats would build significantly more renewable energy, aiming to generate 80% of our electricity from renewables by 2030.”

 

Peter Capener, Managing Director of Bath & West Community Energy said:

 

“Our work with schools is really demonstrating the value of community energy in both addressing the climate crisis and reducing fuel bills. Rooftop solar installed last year has already saved local schools a combined total of £134,209 and has reduced carbon emissions by 224.3 tonnes, which is equivalent to 12,173 journeys from Bath to Edinburgh by train!”

Wera Hobhouse

This website uses cookies

Please select the types of cookies you want to allow.